Days 20-23: Shipping M1, M2, M3 in Four Days
PanPanMao build diary Days 20-23: 166 commits, 3 formal milestones, 17 PRs. Credit economy foundation, Daily Hub with pre-generated content, and PostHog analytics.
PanPanMao build diary Days 20-23: 166 commits, 3 formal milestones, 17 PRs. Credit economy foundation, Daily Hub with pre-generated content, and PostHog analytics.
PanPanMao build diary Days 12-19: Referral system, palm reading with MediaPipe, landing page dark luxury redesign, and the realization that engineering is the easy part now.
PanPanMao build diary Days 5-10: Vitest testing sprint, the birth of the PanPanMao cat brand, landing page design, Stripe integration, and credit economy with dried fish treats.
PanPanMao build diary Days 2-4: CSS restoration hell, extracting shared packages, adding MBTI app, WeChat browser detection, and the unified API layer with 52 migrated routes.
PanPanMao build diary Day 1: Starting a Chinese metaphysics AI platform with zero domain knowledge. 21 commits, monorepo setup, and the hypothesis that AI can bridge any knowledge gap.
© Xingfan Xia 2024 - 2026 · CC BY-NC 4.0